TCO Analysis →
Docs · Claims · D-16 · updated August 2026

Claims registry

The MDCX claims registry is the public source for marketed numbers cited on this site. Updated August 2026. Figures are design targets; site and climate conditions apply.

Hero-only exceptions and unverifiable items are omitted. Retired claims are listed without their former values. Cite a row by its stable ID (for example #C4).

Schedule & scale

ID Claim Value Basis / qualifier
C1Site scale range0.4–200 MWEntry = one I400C40 block (400 kW); upper bound product envelope
C2Former whole-site schedule claimRETIREDRetired 2026-08-16. Depends on freight and customs, which MDCX does not estimate. Do not restate.
C3Expansion block delivery90 days ex-worksFrom receipt of down payment. Not a guarantee or SLA.
C4First delivery90 days ex-works (up to 120 if line full)From receipt of down payment to EXW. Firm date at order.
C36On-site installation & commissioning2–4 weeksMDCX-controlled segment after the unit is on site
C37Schedule start pointreceipt of down paymentNot contract signature
C38Standard configuration onlyno bespoke box engineeringConfiguration is system-level (count, layout, power boundary)
C39Freight & customsbuyer-arrangedMDCX publishes no estimate. Never an end-to-end duration.

Liquid Cooling

ID Claim Value Basis / qualifier
C7L1240C45 (L1240C45SUR150) IT1,240 kW ITLiquid Cooling · C45 · S · UPS · R150 · design load
C8L1240C45 rack density150 kW/rack maxR150
C9L1240C45 / liquid PUE≈ 1.15–1.20Site/climate dependent
C28L1800C45 (L1800C45DR220) IT1,800 kW ITC45 · Dual · no UPS · Coming soon
C29L1800C45 rack max220 kW/rackR220
C30L450C20 (L450C20DR150) IT450 kW ITC20 · Dual · no UPS · Coming soon
C32L450C20 rack max150 kW/rackR150
C33Dual-loop water (D)GPU 36–45 °C · CRAH 10/16 °CApplies to L450C20DR150 and L1800C45DR220

Immersion Cooling

ID Claim Value Basis / qualifier
C10I400C45 / I400C40 IT400 kWI400C45SUT50 · I400C40ST50
C11Immersion GPU countup to 512 PCIe GPUsPer 8-tank I400 pod
C12Immersion PUE≈ 1.05Marketing approx
C13Immersion tank density50 kW/tank maxT50
C34I200C20 (I200C20ST50) IT200 kW ITC20 · 4× A32 · no U · T50 · Coming soon
C35I200C20 tanks4 × A324 × 50 kW/tank = 200 kW IT

Platform, company, context

ID Claim Value Basis / qualifier
C6Availability stanceTier III-classVia differentiated redundancy, not blanket 2N
C14Founded2021Company
C15HQ440 N Wolfe Rd, Sunnyvale, CA 94085US HQ; APAC hub Singapore
C16Countries served40+Marketing
C19Capacity envelope200 MWUpper envelope; same bound as C1
C20CIOS offline autonomy≥7 daysEdge-first single-box
C21CIOS start1 boxSingle-node deploy
C22CIOS driversModbus + SNMPModbus TCP, SNMP v2c
C23CIOS licenseOpen-core Apache-2.0Core open; commercial surfaces
C24HVDC800 V HVDCRoadmap · Q3 2026
C25BESS ride-through120 minStandard
C26DCM statusRoadmapDecentralized Compute Market, MVP in development
C27DCM commercial modesSpot · Plans · ReservedC2C / B2C / B2B
C31Solution UPS flagU / omitU = UPS+battery included; omit = none
C40GPU generation cadence~12 monthsIndustry context, not an MDCX spec
C41Conventional data center build18–36 monthsIndustry context, not an MDCX delivery promise

Specifications updated August 2026 · design targets, site conditions apply.

Internal source: docs/CLAIMS.md. Marketing pages quote this registry; they do not invent numbers.