Open Designer TCO Analysis →

MDCX Reference Design

400 Immersion Cooling Container with UPS (I400C45)

I400C45SUT50

45ft 400 kW Immersion Cooling container · UPS · up to 50 kW/tank

Overview

What this SKU is: envelope, installed units, density, and the geometry you can download. Figures here are properties of the product, not of any one site.

ItemValueBasis
IT design load400 kWclaim C10
Installed units8table MDCX immersion container specification
Maximum density50 kW/tankclaim C13
Air-cooled rack load10 kWtable MDCX immersion container specification
GPU capacity512claim C11
Envelope14,000 × 2,438 × 3,490 mmtable ISO container envelope, MDCX module geometry
Footprint34.1 derived 14.000 m × 2.438 m
Lead time90 days ex-worksclaim C3

3D views

Orthographic and section views are generated from the published module geometry for this SKU. The interactive view is read-only — this is the standard configuration, not a configurator.

MDCX I400C45 immersion cooling container cutaway
MDCX I400C45 immersion cooling container cutaway

Geometry and schedules

System boundary

The MDCX-supplied envelope is the container. Primary (utility) and secondary (facility) electrical sides meet at the transformer. Site responsibility begins at the published electrical and water interfaces.

Interface definition only. Implementation details are not published.

Power distribution

How power is broken down and distributed inside the boundary, and what the site must present at the connection point.

IT load against plant overhead

At: USA - Pennsylvania (PJM), 34 °C, Summer peak, 100% utilization. The racks draw below the density ceiling at this GPU — 30 kW of rack headroom remains.

Power distribution IT design load: 370 kW78.2%Plant overhead: 103 kW21.8%

Plant consumers

Plant consumers Tank CDU pumps13.6 kWDry cooler fans12.4 kWHybrid chiller61.0 kWUPS conversion loss7.9 kWDistribution loss3.7 kWFacility auxiliaries4.3 kW
ConsumerPowerShare of facility
IT — immersion tanks360 kW76.1%
IT — air-cooled rack10.0 kW2.1%
Tank CDU pumps13.6 kW2.9%
Dry cooler fans12.4 kW2.6%
Hybrid chiller61.0 kW12.9%
UPS conversion loss7.9 kW1.7%
Distribution loss3.7 kW0.8%
Facility auxiliaries4.3 kW0.9%
Facility total473 kW100%

Plant overhead is 102.9 kW, 27.8% of IT, for a PUE of 1.278 at this point.

Single-line topology

Single-line topology (interface definition). Protection settings are not published.

Single-line topology GridTransformerMain switchUPSIT load onlyIT-PDC2N — A / B feed×2Tank×8PDC1 (facility)

Ratings at the boundary

Ratings in this section are derived from the IT design load and the published PUE band. They size an interface; they are not measured results and are not claims-registry facts. Each derived row prints its formula.

C12 immersion PUE ≈ 1.05 is peak dry-bulb ≤ 24 °C / free-cooling only. Hot-zone PUE is not 1.05.

ItemValueBasis
IT design load400 kWclaim C10
Facility load451.8–565.8 kWderived 400 kW × PUE 1.129–1.415
Connection capacity497–622.4 kWderived facility load × 1.10
Transformer capacity497–622.4 kWderived sized to connection capacity
UPS capacity (IT only)600 kWtable MDCX power bay schedule
Battery backup20 mintable MDCX immersion container specification

Load schedule

PDC1 (facility)

LoadPhaseVoltagePower kWPFQtyTotal kWCurrent A
Tank CDU 1…83380 V1.70.9911.73.3
Cooling tower 13380 V150.811535.6
Cooling tower 23380 V150.811535.6
Precision air conditioning3380 V100.811023.7
Lighting1220 V0.30.861.810.2
Fire suppression1220 V10.8115.7
Monitoring1220 V0.50.810.52.8
Fresh air1220 V10.8115.7
Spare3380 V100.811032.9
Total57.9 kW178.4 A

IT-PDC1 (A feed)

2N pair — one feed carries the full IT zone; they do not sum.

LoadPhaseVoltagePower kWPFQtyTotal kWCurrent A
Tank 1…83380 V450.9914586.3
IT rack3380 V50.81511.9
Network switches1220 V20.881638
Total381 kW740.5 A

IT-PDC2 (B feed)

2N pair — one feed carries the full IT zone; they do not sum.

Total381 kW740.5 A

Interface definition only. Implementation details are not published.

Cooling distribution

How heat leaves the racks and reaches ambient: the loops, their design temperatures and flows, and where the plant switches from free cooling to mechanical cooling.

Heat distribution

At: USA - Pennsylvania (PJM), 34 °C, Summer peak, 100% utilization. The racks draw below the density ceiling at this GPU — 30 kW of rack headroom remains.

Heat distribution Dielectric coolant — direct immersion: 360 kW97.3%Air — auxiliary rack: 10.0 kW
Heat pathHeatShare of IT
Dielectric coolant — direct immersion360 kW97.3%
Air — auxiliary rack10.0 kW2.7%
IT heat total370 kW100%

97.3% of the heat leaves directly into the dielectric coolant; 2.7% is air from the auxiliary rack. There is no room-air cooling path to size.

Loop schematic

Cooling distribution oil 250 L/minprimary 32/37 °CImmersion tank35/43 °C×8Tank CDU2N×16Free cooler / hybrid chillerswitch at 24 °C

Loops

LoopSupplyReturnΔTDesign flowFluid
Tank oil loop — direct immersion35 °C43 °C8 K250 L/minSingle-phase dielectric coolant
Primary loop — CDU to heat rejection32 °C37 °C5 K125 L/min per CDU25% glycol

Heat rejection

Free cooling below the switch temperature; hybrid chiller above it

ItemValueBasis
CDU rated cooling800 kWtable MDCX immersion tank specification
CDU units installed16table MDCX immersion tank specification
In-row CRAH installedTBDTBD
In-row CRAH rated coolingTBDTBD
In-row CRAH fan powerTBDTBD
CDU secondary flow2,000 L/mintable MDCX immersion tank specification
CDU approachTBDTBD
Pressure drop35–45 kPatable MDCX immersion tank specification
Pipe diameterDN50table MDCX immersion tank specification
Switch temperature24 °Ctable MDCX heat-rejection selection rule

Interface definition only. Implementation details are not published.

Performance

PUE, WUE, and annual energy depend on site and workload, so they are not properties of the SKU. Solve this SKU at your own site:

Basis and disclaimer

Computed numbers in this document are operating-point results for the stated city, season, workload, and utilization. They are not guarantees or SLAs. Marketed numbers live in the claims registry.

Cited claims: C3 · C4 · C31 · C36 · C37 · C38 · C39 · C10 · C11 · C12 · C13.

C12 immersion PUE ≈ 1.05 is peak dry-bulb ≤ 24 °C / free-cooling only. Hot-zone PUE is not 1.05.

Expansion block and first delivery are 90 days ex-works from receipt of down payment (C3, C4); on-site installation and commissioning 3–4 weeks (C36). Freight and customs are buyer-arranged; MDCX publishes no estimate (C39). Retired schedule and fleet-PUE claims are not restated.

Reserved items

This document publishes what a correct result looks like. It does not publish how MDCX produces it, or with what.

WithheldStatement
BOM, makes, models, suppliersBill of materials, makes, models, and suppliers are not published.
Control logic, alarm thresholds, tuningControl logic, alarm thresholds, and tuning policy are not published.
Solver kernelThe solver kernel is not published. Operating conditions and result numbers are.
Manufacturing and quality path, taktManufacturing path, quality process, and line takt are not published.
Price and commercial termsPrice and commercial terms are not published.